All work is carried out by fully accredited and trained tradespeople with many years experience in our industry under our direct supervision.
All refrigeration work will be carried out by fully competent and trained refrigeration fitters who have accreditation with the Artic in the handling of refrigerants.
A licensed electrical contractor approved by Western Power will carry out all electrical work.
► The fan coil unit will be suspended from the roof structure; various methods of fixings are used depending on the home construction and available space.
► Once a complete site inspection has been carried out by the Winton Air Conditioning installation team, we will discuss grille positions with you. We will suggest positions based on providing the best performance possible. However should you have specific requirements, please discuss these with our team.
► The Winton Air Conditioning refrigeration fitter will discuss with you the outdoor unit position; consideration must be given to adequate space to prevent air recirculation. The outdoor unit will be placed on condenser mounts to prevent vibration and be secured to the ground.
► Fully insulated refrigeration piping will connect the indoor unit to the outdoor unit. This piping will run thru ceiling space and where exposed to view on outside of home will be enclosed in a suitable pipe cover.
► Condensate will be drained from the indoor fan coil unit utilising a minimum 20 mm “P” trapped waste pipe, the fan coil will also be fitted with an emergency drain pan which will also be piped into the condensate waste pipe.
► Our Winton Air Conditioning approved electrical contractor will run a dedicated electrical circuit from your switch board to the outdoor unit, complete with a weather proof isolator mounted adjacent to the outdoor unit. Inter connecting control wiring between indoor and outdoor units will be run alongside refrigeration piping.
► Our electrician will discuss with you the various positions available to locate the air conditioning controller and zone station panel.
► Once our Winton Air Conditioning team have completed the installation our qualified refrigeration fitter will carry out the final commissioning, this includes checking of refrigerant levels, electrical connections, air balancing and general performance tests.
► After commissioning we will explain correct operating procedures and discuss with you how to operate your system most efficiently.